亚洲精品少妇久久久免费视频,亚洲欧美色一区二区三区三州,欧美精品日韩精品国产精品,国产又粗又猛又黄又爽视频,日本天堂亚洲一区二区三区,av中文字幕第一页在线,久久96精品国产亚洲蜜臀,欧美成人精品午夜第一区

XJ350 Workover Rigs

The XJ350 (60-ton) workover rig is suitable for minor workover operations at a well depth of 4000 meters using Φ73mm externally thickened tubing, major workover operations at a well depth of 3200 meters using Φ73mm drill pipe, and at a depth of 2500 meters using Φ88.9mm drill pipe. The XJ350 (60-ton) workover rig uses a special vehicle chassis for its mounting. The drum comes in two forms: single-drum and double-drum. The winch's auxiliary brake can be equipped with an air-controlled disc brake as an option.

Product Features

Product Parameters

Operation Depth (Minor Workover)

4000 m (27/8" thickened tubing)

Operation Depth (Major Workover)

3200 m (27/8" drill pipe)

2500 m (31/2" drill pipe

Rated Hook Load

600 kN

Maximum hook load

900 kN

Power Rating

350 hp

Derrick Height (Clear Height)

31.7 m

Travel System

3×4

Chassis Drive Configuration

8×8

Wireline Diameter

φ26mm

Transport Dimensions

17.2 m×3.1 m×4.28 m

Maximum Driving Speed

60 km/h (speed limit 45 km/h)

Minimum Turning Radius

15 m

Total Weight in Transport State

42000 kg (total weight varies with different configurations)

Operating Temperature Range

-29~+50 ℃

Operating parameters

Optional Configuration

Download

>Contact Us

Headquarter

  • Company Name:Hubei Petrokh Machine Manufacturing Co., Ltd
  • Address:No.16 Jiuyang Avenue, Jingzhou City, Hubei Province, China
  • Tel:+86 716 8268511
More information
韶关市| 全椒县| 西城区| 小金县| 新沂市| 卢湾区| 天柱县| 肥乡县| 淮北市| 新昌县| 平遥县| 财经| 都江堰市| 新河县| 龙井市| 福贡县| 抚顺市| 富锦市| 仪征市| 孙吴县| 宝应县| 奉贤区| 鄂伦春自治旗| 德阳市| 铜山县| 兴和县| 建昌县| 金平| 宜章县| 宁都县| 崇左市| 高阳县| 衢州市| 沐川县| 宣武区| 湄潭县| 若羌县| 阳曲县| 博罗县| 昌黎县| 桃园市|